WK

Wind Keeper

Wind Keeper

Wind Keeper

Wind Keeper was delivered in July 2025 and is the eight vessel in Cadeler’s growing portfolio of wind farm installation vessels.

The name symbolises both the vessel’s position as a rare and valuable find – a true “keeper” – and her focus on ensuring the up-keep of green energy generation through the provision of O&M services to the offshore wind industry.

Completed in 2024 and fitted with advanced European equipment, including a Huisman main crane with a 2,200 t lifting capacity, Kongsberg’s DP2 dynamic positioning system, MAN-supplied engines and a Siemens propulsion system, Wind Keeper is uniquely suited for the global offshore O&M market, with 120-meter-long jack-up legs that will enable her to work on the most challenging offshore sites.

A deeper dive
Technical specifications
Download