Wind Keeper was delivered in July 2025 and is the eight vessel in Cadeler’s growing portfolio of wind farm installation vessels.
The name symbolises both the vessel’s position as a rare and valuable find – a true “keeper” – and her focus on ensuring the up-keep of green energy generation through the provision of O&M services to the offshore wind industry.
Completed in 2024 and fitted with advanced European equipment, including a Huisman main crane with a 2,200 t lifting capacity, Kongsberg’s DP2 dynamic positioning system, MAN-supplied engines and a Siemens propulsion system, Wind Keeper is uniquely suited for the global offshore O&M market, with 120-meter-long jack-up legs that will enable her to work on the most challenging offshore sites.