These newest additions to the fleet operate with impressive high-capacity 2600t main cranes, allowing the safe installation and maintenance of heavy foundations and the components relating to offshore wind turbines. The vessels are designed to operate in water depths of up to 65 metres.
Wind Mover is currently under construction at the Hanwha Ocean Shipyard in Korea. She will be delivered to Cadeler in Q4 2025.